**Tamboran Commences DRilling Campaign in the Beetaloo Sub-basin: A Strategic Move Toward Enhanced Gas Reserves**
In a significant step toward unlocking the vast potential of the Beetaloo Sub-basin in Northern Australia, Tamboran (B2) Pty. Ltd. has commenced a robust two-well drilling campaign. This ambitious project, known as the Shenandoah South Pilot Project, will see the spudding of the Shenandoah South 2H (SS2H) and Shenandoah South 3H (SS3H) horizontal wells under Exploration Permit (EP) 98. This drilling initiative is a direct response to the promising geological data collected from previous wells, particularly the Shenandoah South 1H (SS1H), which revealed high-quality Mid Velkerri B Shale with strong dry gas shows and unprecedented drilling speeds.
### Key Highlights of the Drilling Campaign
1. **Drilling Rig and Operational Details**:
– The drilling operations will utilize the H&P super-spec FlexRig, a state-of-the-art rig capable of efficiently drilling complex geological formations.
– Each well is expected to take approximately 30 days to complete, including the horizontal section targeting the Amungee Member B-shale at an estimated depth of 3,020 meters (9,910 feet).
2. **Stimulation Program**:
– Following drilling, both wells will undergo a comprehensive stimulation program using Liberty Energy’s advanced frac fleet, which will significantly increase stimulation intensity and optimize gas flows.
– The stimulation process will involve up to 60 stages per well, a marked improvement over previous methods, aimed at maximizing gas production.
3. **Joint Venture Partners**:
– The project is a joint venture between Tamboran (77.5%) and Falcon Oil & Gas Australia Limited (22.5%), highlighting the collaborative spirit in the industry.
– Falcon